Part 2- Outdoor Zip | WORKING → |
If installing stucco, an additional water-resistive barrier (WRB) might be required, though the system itself is an approved WRB.
The objective is to install ZIP System sheathing and tape to create a continuous air and water-resistive barrier, eliminating the need for traditional house wrap. Engineered wood panels with integrated overlay. Part 2- Outdoor zip
When flashing over already-taped areas, consider cleaning the tape surface with acetone/mineral spirits to ensure adhesion. If installing stucco
Specialized acrylic tape (3.75" or wider) or Liquid Flash. Exposure: Panels can remain exposed for up to 180 days. 2. Installation Procedures (Wall Sheathing) Part 2- Outdoor zip